Monday, 9 January 2017

Erecting Scaffolding In Worthing? Have A Look At The Prevalent Rules

In Worthing as well as all over the UK, Health and Safety Executive (HSE) is responsible for governing all the rules and regulations related to scaffolding. These regulations are necessary to ensure that companies erecting the structure in the UK are adhering to the British and European standards for scaffolding. According to a very recent survey conducted by a reputed news channel, in the last few years, the health and safety laws had improved a lot in the UK. Since every construction site is a dangerous zone, maintaining the prevalent laws and regulations is a must to ensure the safety of the workers.



Few Scaffolding Rules And Regulations Prevalent In Worthing


Scaffolding Companies

They should be working under the auditable processes, be a member of the NASC, and maintain a record of the training scheme. Two of the insurances they should be maintaining are £10 million as Employers Liability and £5 million as Public Liability. Only competent scaffolders should be employed for erecting the structure on the site.

Scaffolders

Every worker erecting the structure should carry a CISRS Scaffolders Labourer’s card. Receiving Manual Handing Training according to the NASC Guidance Note is also a must. They should attend a one-day training course named as CISRS COTS before they start with their duties.

Trainee Scaffolders

Each of the trainee scaffolders should carry a CISRS Trainee Scaffolder card and undergo the latest edition SG4 training. They also have the flexibility to work under the direct guidance of a CISRS scaffolder. Until an operative completes all the required training and assessment, they are considered to be a trainee scaffolder. It doesn’t matter how long they have been in the industry. 

Scaffolding Design

All the structures should be professional designed to offer maximum rigidity, stability, and strength when erected. If any additional structure which does not fall under the TG20 Compliance Sheet is required, it should be designed by a competent designer. Clients should also be provided with a copy of the design for acceptance.

Risk Assessment

Before scaffolding in Worthing is erected, altered, or dismantled, each should undergo a job or site specific assessment. This assessment report should be recorded in a written format and accepted by the contractor. Every Risk Assessment or Method Statements should be carried out in accordance with the scaffold contractor’s health and safety policy. Signing the document from the operator is necessary to demonstrate that they have been undergoing a specific scaffolding job.

Inspection

Even after the structure has been erected it should be regularly inspected by experienced engineers and professionals after every 7 days or after events which could affect the stability of the structure. This inspection report should be recorded in the register. If any tag type system is used during the inspection procedure, it should also be updated in the report.


Since the safety of the construction workers matters the most, make sure to follow the prevalent laws and regulations to ensure the safety of all.

For information about commonly used scaffolding click here.